In European cooperation the Deutsches Elektronen-Synchrotron DESY plans the construction of an X-ray laser. The plant is designed to produce high-intense ultra-short X-ray flashes with the characteristics of laser-light for scientific purposes.
|
 |
Period |
2004 - 2012 |
Field of Expertise |
Ingenieurbauwerke
|
Object type |
Universität / Institut, tunnles |
Service |
study, official approval of planning, project design, structural design, site management, on-site construction inspection, supervision of health and safety protection |
Construction sum |
970,000,000 EUR |
 |
|



 |
 |
The enclosing walls are designed as double anchored diaphragm walls that show reduced deformation. In crossing zones such as the tunnel connection to the parliament building and the service tunnel a double anchored sheet-pile wall was used in order to make feasible the later connection to the neighbour excavation pits.
|
 |
Period |
1996 - 2002 |
Field of Expertise |
Tragwerksplanung
|
Object type |
office buildings, parking facilities |
Service |
project design Baugrube, structural design, inspection of work with watertight concrete structures |
Construction sum |
400,000,000 EUR |
 |
|



 |
 |
The new service wing of the opera house will enlarge the existing stage and will provide space for rehearsal stages, depots and other service facilities. A commercial and office wing will envelope the service wing on two sides.
|
 |
Period |
2000 - 2004 |
Field of Expertise |
Tragwerksplanung
|
Object type |
office buildings, entertainment facilities, trade / industry |
Service |
project design Baugrube, structural design, supervision of health and safety protection, inspection of work with watertight concrete structures |
Construction sum |
34,000,000 EUR |
 |
|



 |
 |
At the suburban fringe of Tashkent, Uzbekistan, a logistic centre is being planned, comprising a cotton warehouse of 20,000 m² to 30,000 m² and various other warehouses for coffee, tea and miscellaneous import goods as well as a container terminal.
|
 |
Period |
2004 - offen |
Field of Expertise |
Tragwerksplanung Industrie- und Gewerbebau
|
Object type |
warehouses |
Service |
project design |
Construction sum |
30,000,000 EUR |
 |
|
 |
 |
Financed by KfW in cooperation with the Government of the Peoples Republic of Mo-zambique a silo with a conveyor bridge and a mobile ship-unloader was implemented. First step was a feasibility study to determine the need for such storage facility.
|
 |
Period |
1991 - 1997 |
Field of Expertise |
|
Object type |
silo |
Service |
study, project design, structural design, site management, on-site construction inspection |
Construction sum |
20,000,000 EUR |
 |
|
 |
 |
Financed by KfW in cooperation with the Zimbabwean Government two silos were built and an existing one extended. The silo at Lions Den was up-graded in its equipment and increased in storage capacity (to 125.000 t).
|
 |
Period |
1988 - 1990 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
silo |
Service |
project design, structural design, on-site construction inspection |
Construction sum |
13,000,000 EUR |
 |
|



 |
 |
In order to extend the HHLA Container Terminal Tollerort in the Port of Hamburg another 300 m of quay wall were built. In addition the “Europakai” was extended by 50 m and in connection with this land with an area of approximately 40.000 m² claimed.
|
 |
Period |
1997 - 2000 |
Field of Expertise |
Ingenieurbauwerke Industrie- und Gewerbebau Infrastruktur
|
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Service |
study, general construction planning, project management, project design, structural design, site management, on-site construction inspection |
Construction sum |
12,500,000 EUR |
 |
|



 |
 |
In an existing silo various elements like a certain number of bins were demolished and replaced by office facilities. The total area is 33 x 33 m. The existing silo had a height of 43 m. Six of the external bins were included in the new construction.
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Tragwerksplanung
|
Object type |
office buildings |
Service |
demolition planning, analysis of existing structures, static calculation of existing structures, structural design, concrete reconstruction consulting, Due Diligence |
Construction sum |
12,000,000 EUR |
 |
|
 |
 |
The orthopaedic section of the University Hospital Eppendorf was rebuilt and in addition extended by a new building.
|
 |
Period |
1999 - 2002 |
Field of Expertise |
Tragwerksplanung
|
Object type |
Universität / Institut, hospitals |
Service |
demolition planning, static calculation of existing structures, structural design |
Construction sum |
11,000,000 EUR |
 |
|
 |
 |
The Logistik Terminal Waltershof, Hamburg, is planning to build a second warehouse for storage of sports and leisure fabrics. A part of the building will serve as a storage space of water pollutants.
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
warehouses |
Service |
general construction planning, project design, site management, on-site construction inspection, fire protection concept |
Construction sum |
10,000,000 EUR |
 |
|
 |
 |
To secure the company location in Hamburg, Eurogate Container Terminal Hamburg GmbH intends to expand its storage capacities for containers. The site of the former tank area Dradenau has been chosen for the extension of the company grounds.
|
 |
Period |
2003 - 2004 |
Field of Expertise |
Infrastruktur
|
Object type |
trade centres |
Service |
project management, project design, site management, on-site construction inspection |
Construction sum |
8,000,000 EUR |
 |
|
 |
 |
The new residential and office building in the Hamburg HafenCity with a building area of approximately 5,000 m² is located at the edge of the historical “Speicherstadt“ in a row of 8 new buildings at the waterfront.
|
 |
Period |
2002 - 2004 |
Field of Expertise |
Tragwerksplanung
|
Object type |
office buildings, residential buildings |
Service |
structural design in competition, structural design, competition consulting |
Construction sum |
7,000,000 EUR |
 |
|
 |
 |
In order to utilize the hard-salt storage in the salt deposits of Bokeloh K+S AG developed their own method to produce the special fertiliser “Kieserit”. This method is based on an electro-static separation method. The plant has a capacity of 300.000 t/a.
|
 |
Period |
1999 - 2001 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
industrial facilities, silo |
Service |
structural design, site management, on-site construction inspection |
Construction sum |
7,000,000 EUR |
 |
|
 |
 |
The Schwinge Bridge is a section of the detour around the city of Stade.An opening of 15 m width has to be provided to ensure the accessibility to the ships on the river Schwinge.
|
 |
Period |
1985 - 1988 |
Field of Expertise |
Ingenieurbauwerke Infrastruktur
|
Object type |
bridges, roads and highways, bewegliche bridges |
Service |
study, project design, structural design, on-site construction inspection |
Construction sum |
6,500,000 EUR |
 |
|
 |
 |
The Institute for forensic medicine was reconstructed and in addition extended by a new 2-storey building. The existing building was built in the 1960s. By the addition the total area increases from 843 m² to 2,130 m².
|
 |
Period |
1997 - 2002 |
Field of Expertise |
Tragwerksplanung
|
Object type |
Universität / Institut, hospitals |
Service |
static calculation of existing structures, structural design |
Construction sum |
6,000,000 EUR |
 |
|
 |
 |
Two buildings, with plan areas of 4.000 m² and 2.000 m², are designed for the storage and handling of tea and other packaged goods in the year 2003.
|
 |
Period |
2003 |
Field of Expertise |
Tragwerksplanung
|
Object type |
office buildings, warehouses |
Service |
project design, structural design, on-site construction inspection, fire protection concept |
Construction sum |
5,500,000 EUR |
 |
|



 |
 |
In order to make the new areas of the HafenCity accessible to fire protection and first aid services, there is a need for a new network of pathways at 7.5 m above sea level (SL). The Kibbelsteg bridges connect this network to the high tide protected areas of the inner city, crossing the Zollkanal, the Brooksfleet, and the “Am Sandtorkai“ street.
|
 |
Period |
1999 - 2002 |
Field of Expertise |
Ingenieurbauwerke Infrastruktur
|
Object type |
bridges, roads and highways |
Service |
study, general construction planning, project design, analysis of existing structures, structural design, on-site construction inspection, feasibility study |
Construction sum |
5,300,000 EUR |
 |
|



 |
 |
The waste water treatment plant in Lübeck has set a long-term plan to decontaminate the discharge system and to convert the central treatment pools of the existing mixed water canalisation to a divided canalisation system. In achieving this goal, the treatment plant requires the construction of two new underground collection channels.
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Ingenieurbauwerke
|
Object type |
tunnles, sluice |
Service |
project design |
Construction sum |
5,000,000 EUR |
 |
|
 |
 |
The existing quay, built in 1985 for the container terminal at Rheinhafen Germersheim, which is operating at full capacity, was extended by 145 m.
|
 |
Period |
1999 - 2001 |
Field of Expertise |
Industrie- und Gewerbebau Infrastruktur
|
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Service |
project management, project design, structural design, on-site construction inspection |
Construction sum |
5,000,000 EUR |
 |
|



 |
 |
The construction of the “Klimahaus“ (Climate House) in the area between the old harbour of Bremerhaven and the river Weser will create a special tourist attraction for Bremerhaven.
|
 |
Period |
2003 - 2007 |
Field of Expertise |
Ingenieurbauwerke Infrastruktur
|
Object type |
bridges, bewegliche bridges |
Service |
general construction planning, project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection |
Construction sum |
4,500,000 EUR |
 |
|
 |
 |
A new Highway bridge is planned to substitute the removed railway crossing of Dassauweg in Hamburg. The construction site is situated in the natural conservation area.
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Ingenieurbauwerke Infrastruktur
|
Object type |
bridges, railway structures, roads and highways |
Service |
project design, structural design |
Construction sum |
4,200,000 EUR |
 |
|
 |
 |
A new multi-storey covered car park with about 400 parking lots is planned to be constructed in the area of the existing P+R-complex situated in the northwest of Bergedorf’s S-Bahn train station. This plan anticipates a future addition of about 800 more parking lots.
|
 |
Period |
2002 - 2005 |
Field of Expertise |
Tragwerksplanung Infrastruktur
|
Object type |
terminals, parking facilities |
Service |
project design, structural design, site management, on-site construction inspection, fire protection concept |
Construction sum |
4,000,000 EUR |
 |
|



 |
 |
The new footbridge at the Buchholz Train Station will serve as a connection between the two city areas, which are separated by the railway track. Furthermore, new staircases and elevators will provide access to the northern and southern platforms.
|
 |
Period |
2003 - 2005 |
Field of Expertise |
Ingenieurbauwerke Infrastruktur
|
Object type |
bridges |
Service |
project design, structural design, on-site construction inspection, Site supervision as accredited Check Engineer, supervision of health and safety protection |
Construction sum |
2,700,000 EUR |
 |
|
 |
 |
As a replacement for the dilapidated partially two-span bridge complex over the Mönkedammfleet, built between 1840 and 1910, a new singlespan road bridge is situated along the Alter Wall street.
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Infrastruktur
|
Object type |
bridges, roads and highways |
Service |
project design, structural design |
Construction sum |
2,500,000 EUR |
 |
|
 |
 |
To secure the present status of Hamburg and especially that of the EurogateContainer Terminal as leading trans-shipment location the City of Hamburg built another 380 m of quay wall.
|
 |
Period |
2003 - 2005 |
Field of Expertise |
Infrastruktur
|
Object type |
trade centres, flood protection structures, storage facilities for water pollutants |
Service |
project management, official approval of planning, project design, site management, on-site construction inspection |
Construction sum |
2,000,000 EUR |
 |
|
 |
 |
The project includes an extruder- and a mixing-plant for grain as well as a machine tower and a warehouse.
|
 |
Period |
1999 - 2002 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
industrial facilities, mill |
Service |
project design, structural design, site management, on-site construction inspection, structural fire protection |
Construction sum |
1,700,000 EUR |
 |
|
 |
 |
The TESLA Test Facility (TTF) is an experimental plant with the purpose to test the operation of the linear accelerator (LC) and the X-ray laser (XFEL) for the planned 33 km long TeV Energy Superconducting Linear Accelerator (TESLA).
|
 |
Period |
1995 - 2000 |
Field of Expertise |
Ingenieurbauwerke
|
Object type |
Universität / Institut, tunnles |
Service |
project design, structural design, on-site construction inspection |
Construction sum |
1,700,000 EUR |
 |
|
 |
 |
The existing milling plant (Rosenmühle) at Landshut was extended by a mill with the capacity of 180 t/d soft wheat.
|
 |
Period |
2001 - 2002 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
industrial facilities, mill |
Service |
project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection, structural fire protection |
Construction sum |
1,500,000 EUR |
 |
|
 |
 |
The Wesermühlen Hameln replaced their existing open-air discharging system by a new plant integrated in their main mill building. Discharging capacity for wheat-, rye- and maize-milling-products now is 150 t/h.
|
 |
Period |
2001 - 2002 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
silo, mill |
Service |
project design, site management, on-site construction inspection, supervision of health and safety protection |
Construction sum |
1,260,000 EUR |
 |
|
 |
 |
The glass bridge over the Bugenhagenstraße, Hamburg, serves as a footbridge connecting two buildings with a weather protection.
|
 |
Period |
1995 - 1997 |
Field of Expertise |
Tragwerksplanung
|
Object type |
bridges |
Service |
structural engineering audit, Site supervision as accredited Check Engineer |
Construction sum |
150,000 EUR |
 |
|
 |
 |
In connection with the modernization of the milling plant Ellmühle at Cologne-Deutz the existing unloader was extended to a total length of 14 m. Reason was lack of reach due to changed water-levels.
|
 |
Period |
1999 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
industrial facilities, mill |
Service |
demolition planning, project design, analysis of existing structures, structural design, site management |
Construction sum |
120,000 EUR |
 |
|
 |
 |
Three different underground routes have been proposed to connect the “HafenCity“, Hamburg’s newly developing city district, to the underground public transportation network. WTM carried out the feasibility studies and cost estimation for each of the variants.
|
 |
Period |
2001 - k.A. |
Field of Expertise |
Infrastruktur
|
Object type |
tunnles, railway structures |
Service |
study, feasibility study |
Construction sum |
--- |
 |
|



 |
 |
The milling company Mühlschlegel Besitz GbR in the industrial area of Weickelsdorf (Germany) implemented a milling plant with a capacity of 360 t/d. Size of the respective plot is 28.000 m².
|
 |
Period |
2001 - 2003 |
Field of Expertise |
Industrie- und Gewerbebau
|
Object type |
office buildings, industrial facilities, silo, mill, warehouses |
Service |
project design, structural design, planning of services, site management, on-site construction inspection, Site supervision as accredited Check Engineer, supervision of health and safety protection |
Construction sum |
keine Angabe vom clientn erlaubt |
 |
|
 |
 |
Between July 2000 and January 2001 building passes were prepared for 367 general-education schools in Hamburg.
|
 |
Period |
2000 - 2002 |
Field of Expertise |
Tragwerksplanung
|
Object type |
school (incl. in educational institutions) |
Service |
expertise, analysis of existing structures, static calculation of existing structures, restoration planning, Due Diligence |
Construction sum |
--- |
 |
|
|