Between July 2000 and January 2001 building passes were prepared for 367 general-education schools in Hamburg. |
 |
|
|
Period |
2000 - 2002 |
Field of Expertise |
Structural Design |
Object type |
school (incl. in educational institutions) |
Services |
expertise, analysis of existing structures, static calculation of existing structures, restoration planning, Due Diligence |
Construction sum |
--- |
 |
|
 |
|
 |
|
 |
 |
The Institute for forensic medicine was reconstructed and in addition extended by a new 2-storey building. The existing building was built in the 1960s. By the addition the total area increases from 843 m² to 2,130 m². |
 |
|
|
Period |
1997 - 2002 |
Field of Expertise |
Structural Design |
Object type |
Universität / Institut, hospitals |
Services |
static calculation of existing structures, structural design |
Construction sum |
6,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The glass bridge over the Bugenhagenstraße, Hamburg, serves as a footbridge connecting two buildings with a weather protection. |
 |
|
|
Period |
1995 - 1997 |
Field of Expertise |
Structural Design |
Object type |
bridges |
Services |
structural engineering audit, Site supervision as accredited Check Engineer |
Construction sum |
150,000 EUR |
 |
|
 |
|
 |
|
 |
 |
At the suburban fringe of Tashkent, Uzbekistan, a logistic centre is being planned, comprising a cotton warehouse of 20,000 m² to 30,000 m² and various other warehouses for coffee, tea and miscellaneous import goods as well as a container terminal. |
 |
|
|
Period |
2004 - offen |
Field of Expertise |
Structural Design Industrial and Commercial Buildings |
Object type |
warehouses |
Services |
project design |
Construction sum |
30,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
The enclosing walls are designed as double anchored diaphragm walls that show reduced deformation. In crossing zones such as the tunnel connection to the parliament building and the service tunnel a double anchored sheet-pile wall was used in order to make feasible the later connection to the neighbour excavation pits. |
 |
|
|
Period |
1996 - 2002 |
Field of Expertise |
Structural Design |
Object type |
office buildings, parking facilities |
Services |
project design Baugrube, structural design, inspection of work with watertight concrete structures |
Construction sum |
400,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
A new multi-storey covered car park with about 400 parking lots is planned to be constructed in the area of the existing P+R-complex situated in the northwest of Bergedorf’s S-Bahn train station. This plan anticipates a future addition of about 800 more parking lots. |
 |
|
|
Period |
2002 - 2005 |
Field of Expertise |
Structural Design Infrastructure |
Object type |
terminals, parking facilities |
Services |
project design, structural design, site management, on-site construction inspection, fire protection concept |
Construction sum |
4,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In an existing silo various elements like a certain number of bins were demolished and replaced by office facilities. The total area is 33 x 33 m. The existing silo had a height of 43 m. Six of the external bins were included in the new construction. |
 |
|
|
Period |
2001 - 2003 |
Field of Expertise |
Structural Design |
Object type |
office buildings |
Services |
demolition planning, analysis of existing structures, static calculation of existing structures, structural design, concrete reconstruction consulting, Due Diligence |
Construction sum |
12,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The orthopaedic section of the University Hospital Eppendorf was rebuilt and in addition extended by a new building. |
 |
|
|
Period |
1999 - 2002 |
Field of Expertise |
Structural Design |
Object type |
Universität / Institut, hospitals |
Services |
demolition planning, static calculation of existing structures, structural design |
Construction sum |
11,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The new residential and office building in the Hamburg HafenCity with a building area of approximately 5,000 m² is located at the edge of the historical “Speicherstadt“ in a row of 8 new buildings at the waterfront. |
 |
|
|
Period |
2002 - 2004 |
Field of Expertise |
Structural Design |
Object type |
office buildings, residential buildings |
Services |
structural design in competition, structural design, competition consulting |
Construction sum |
7,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
The new service wing of the opera house will enlarge the existing stage and will provide space for rehearsal stages, depots and other service facilities. A commercial and office wing will envelope the service wing on two sides. |
 |
|
|
Period |
2000 - 2004 |
Field of Expertise |
Structural Design |
Object type |
office buildings, entertainment facilities, trade / industry |
Services |
project design Baugrube, structural design, supervision of health and safety protection, inspection of work with watertight concrete structures |
Construction sum |
34,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
Two buildings, with plan areas of 4.000 m² and 2.000 m², are designed for the storage and handling of tea and other packaged goods in the year 2003. |
 |
|
|
Period |
2003 |
Field of Expertise |
Structural Design |
Object type |
office buildings, warehouses |
Services |
project design, structural design, on-site construction inspection, fire protection concept |
Construction sum |
5,500,000 EUR |
 |
|
 |
|
 |
|
|