 |
 |
 |
In order to utilize the hard-salt storage in the salt deposits of Bokeloh K+S AG developed their own method to produce the special fertiliser “Kieserit”. This method is based on an electro-static separation method. The plant has a capacity of 300.000 t/a. |
 |
|
|
Period |
1999 - 2001 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, silo |
Services |
structural design, site management, on-site construction inspection |
Construction sum |
7,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
The existing quay, built in 1985 for the container terminal at Rheinhafen Germersheim, which is operating at full capacity, was extended by 145 m. |
 |
|
|
Period |
1999 - 2001 |
Field of Expertise |
Industrial and Commercial Buildings Infrastructure |
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Services |
project management, project design, structural design, on-site construction inspection |
Construction sum |
5,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In order to extend the HHLA Container Terminal Tollerort in the Port of Hamburg another 300 m of quay wall were built. In addition the “Europakai” was extended by 50 m and in connection with this land with an area of approximately 40.000 m² claimed. |
 |
|
|
Period |
1997 - 2000 |
Field of Expertise |
Civil Egineering Structures Industrial and Commercial Buildings Infrastructure |
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Services |
study, general construction planning, project management, project design, structural design, site management, on-site construction inspection |
Construction sum |
12,500,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In connection with the modernization of the milling plant Ellmühle at Cologne-Deutz the existing unloader was extended to a total length of 14 m. Reason was lack of reach due to changed water-levels. |
 |
|
|
Period |
1999 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, mill |
Services |
demolition planning, project design, analysis of existing structures, structural design, site management |
Construction sum |
120,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The existing milling plant (Rosenmühle) at Landshut was extended by a mill with the capacity of 180 t/d soft wheat. |
 |
|
|
Period |
2001 - 2002 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, mill |
Services |
project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection, structural fire protection |
Construction sum |
1,500,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The project includes an extruder- and a mixing-plant for grain as well as a machine tower and a warehouse. |
 |
|
|
Period |
1999 - 2002 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, mill |
Services |
project design, structural design, site management, on-site construction inspection, structural fire protection |
Construction sum |
1,700,000 EUR |
 |
|
 |
|
 |
|
 |
 |
Financed by KfW in cooperation with the Zimbabwean Government two silos were built and an existing one extended. The silo at Lions Den was up-graded in its equipment and increased in storage capacity (to 125.000 t). |
 |
|
|
Period |
1988 - 1990 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
silo |
Services |
project design, structural design, on-site construction inspection |
Construction sum |
13,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
At the suburban fringe of Tashkent, Uzbekistan, a logistic centre is being planned, comprising a cotton warehouse of 20,000 m² to 30,000 m² and various other warehouses for coffee, tea and miscellaneous import goods as well as a container terminal. |
 |
|
|
Period |
2004 - offen |
Field of Expertise |
Structural Design Industrial and Commercial Buildings |
Object type |
warehouses |
Services |
project design |
Construction sum |
30,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The Logistik Terminal Waltershof, Hamburg, is planning to build a second warehouse for storage of sports and leisure fabrics. A part of the building will serve as a storage space of water pollutants. |
 |
|
|
Period |
2001 - 2003 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
warehouses |
Services |
general construction planning, project design, site management, on-site construction inspection, fire protection concept |
Construction sum |
10,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
The milling company Mühlschlegel Besitz GbR in the industrial area of Weickelsdorf (Germany) implemented a milling plant with a capacity of 360 t/d. Size of the respective plot is 28.000 m². |
 |
|
|
Period |
2001 - 2003 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
office buildings, industrial facilities, silo, mill, warehouses |
Services |
project design, structural design, planning of services, site management, on-site construction inspection, Site supervision as accredited Check Engineer, supervision of health and safety protection |
Construction sum |
keine Angabe vom clientn erlaubt |
 |
|
 |
|
 |
|



 |
 |
The Wesermühlen Hameln replaced their existing open-air discharging system by a new plant integrated in their main mill building. Discharging capacity for wheat-, rye- and maize-milling-products now is 150 t/h. |
 |
|
|
Period |
2001 - 2002 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
silo, mill |
Services |
project design, site management, on-site construction inspection, supervision of health and safety protection |
Construction sum |
1,260,000 EUR |
 |
|
 |
|
 |
|
|