 |
 |
 |
The Schwinge Bridge is a section of the detour around the city of Stade.An opening of 15 m width has to be provided to ensure the accessibility to the ships on the river Schwinge. |
 |
|
|
Period |
1985 - 1988 |
Field of Expertise |
Civil Egineering Structures Infrastructure |
Object type |
bridges, roads and highways, bewegliche bridges |
Services |
study, project design, structural design, on-site construction inspection |
Construction sum |
6,500,000 EUR |
 |
|
 |
|
 |
|
 |
 |
Between July 2000 and January 2001 building passes were prepared for 367 general-education schools in Hamburg. |
 |
|
|
Period |
2000 - 2002 |
Field of Expertise |
Structural Design |
Object type |
school (incl. in educational institutions) |
Services |
expertise, analysis of existing structures, static calculation of existing structures, restoration planning, Due Diligence |
Construction sum |
--- |
 |
|
 |
|
 |
|
 |
 |
In order to utilize the hard-salt storage in the salt deposits of Bokeloh K+S AG developed their own method to produce the special fertiliser “Kieserit”. This method is based on an electro-static separation method. The plant has a capacity of 300.000 t/a. |
 |
|
|
Period |
1999 - 2001 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, silo |
Services |
structural design, site management, on-site construction inspection |
Construction sum |
7,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In European cooperation the Deutsches Elektronen-Synchrotron DESY plans the construction of an X-ray laser. The plant is designed to produce high-intense ultra-short X-ray flashes with the characteristics of laser-light for scientific purposes. |
 |
|
|
Period |
2004 - 2012 |
Field of Expertise |
Civil Egineering Structures |
Object type |
Universität / Institut, tunnles |
Services |
study, official approval of planning, project design, structural design, site management, on-site construction inspection, supervision of health and safety protection |
Construction sum |
970,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
The existing quay, built in 1985 for the container terminal at Rheinhafen Germersheim, which is operating at full capacity, was extended by 145 m. |
 |
|
|
Period |
1999 - 2001 |
Field of Expertise |
Industrial and Commercial Buildings Infrastructure |
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Services |
project management, project design, structural design, on-site construction inspection |
Construction sum |
5,000,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In order to extend the HHLA Container Terminal Tollerort in the Port of Hamburg another 300 m of quay wall were built. In addition the “Europakai” was extended by 50 m and in connection with this land with an area of approximately 40.000 m² claimed. |
 |
|
|
Period |
1997 - 2000 |
Field of Expertise |
Civil Egineering Structures Industrial and Commercial Buildings Infrastructure |
Object type |
trade centres, flood protection structures, warehouses, storage facilities for water pollutants |
Services |
study, general construction planning, project management, project design, structural design, site management, on-site construction inspection |
Construction sum |
12,500,000 EUR |
 |
|
 |
|
 |
|



 |
 |
In connection with the modernization of the milling plant Ellmühle at Cologne-Deutz the existing unloader was extended to a total length of 14 m. Reason was lack of reach due to changed water-levels. |
 |
|
|
Period |
1999 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, mill |
Services |
demolition planning, project design, analysis of existing structures, structural design, site management |
Construction sum |
120,000 EUR |
 |
|
 |
|
 |
|



 |
 |
To secure the present status of Hamburg and especially that of the EurogateContainer Terminal as leading trans-shipment location the City of Hamburg built another 380 m of quay wall. |
 |
|
|
Period |
2003 - 2005 |
Field of Expertise |
Infrastructure |
Object type |
trade centres, flood protection structures, storage facilities for water pollutants |
Services |
project management, official approval of planning, project design, site management, on-site construction inspection |
Construction sum |
2,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
To secure the company location in Hamburg, Eurogate Container Terminal Hamburg GmbH intends to expand its storage capacities for containers. The site of the former tank area Dradenau has been chosen for the extension of the company grounds. |
 |
|
|
Period |
2003 - 2004 |
Field of Expertise |
Infrastructure |
Object type |
trade centres |
Services |
project management, project design, site management, on-site construction inspection |
Construction sum |
8,000,000 EUR |
 |
|
 |
|
 |
|
 |
 |
The existing milling plant (Rosenmühle) at Landshut was extended by a mill with the capacity of 180 t/d soft wheat. |
 |
|
|
Period |
2001 - 2002 |
Field of Expertise |
Industrial and Commercial Buildings |
Object type |
industrial facilities, mill |
Services |
project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection, structural fire protection |
Construction sum |
1,500,000 EUR |
 |
|
 |
|
 |
|
|